Everything Which Needed To Prepare  For A Smooth Start-Up Achievement

Commissioning Engineering

In UFUK BARU, We know exactly that each project is unique, especially in Mechanical completion, Pre-commissioning, Commissioning and Start-up. These stages are the points where a lot of people and project involved parties, start to get excited and confused. It is imperative to take a step back, when the engineering for these milestones are done. Only by a specific, applicable, integrated and comprehensive engineering the risk of project at these stage could be reduced, all interfaces would be managed and success guaranteed.

Our specialized commissioning and  start-up engineering team, who based on their deeply execution experience, realized the requirements to do safe, incident less, cost effective, on time and successful commissioning, start-up and hand over. Different methodologies, standards and activities boundaries identifications for pre-commissioning, commissioning , start-up and hand over are following by different clients, So based on their requested methodology we meet the requirements by detailed procedures.

Our Commissioning Engineering Services

-Design And Construction Engineering Review
-System And Subsystem Identification And Boundary Mark-Up
-Database Preparation For Completion Management System (CMS)
-Online Computerized Completion Management System (CMS)
(For Overall Project Checksheets, Preservation And Punchlists Management System)
-Pre-Commissioning, Commissioning And Start-Up Planning, Budgeting & Manpower Forecasting
-To Develop Project Specific Pre- Commissioning Procedures
-To Develop Project Specific Commissioning Procedures
-To Develop Project Specific Start-Up Procedures
-To Develop Project Specific Handover Procedures
-To Develop Offshore Hook-Up Scope Of Work
-To Develop Commissioning And Start-Up Scope Of Work
-To Develop Commissioning And Operation Technical Advises (COTA) On Engineering Design
-To Finalize All Interfaces For Hook-Up, Commissioning And Start-Up
-To Develop Smooth Start-Up Program (SSP) Implementation Plan, Worksheets  And Procedures
-Operation Implementation Manual (OIM)
-Flaw Identification Exercise (FIE)
-Commissioning Risk Assessment (CRA)
-Smooth Start-Up Execution Plan (SSEP)
-Health Check (HC)
-Operation Readiness Assessment (ORA)
-To Conduct SSP Workshops Review Session
-To Develop SIMOPS Control Procedure
-To Develop Pre-Commissioning, Hook-Up, Commissioning And Start-Up HSE Plan And Procedures
-To Develop Performance Test Run Procedure
-To Develop Operation And Maintenance Manual
-To Develop Pre Start-Up Safety Review (PSSR) Procedure And Conduct Session                    -To Develop Pipeline Pigging And Start-Up Procedure
-To Prepare Jobcards And Work Pack
-Final Documentation